Please be advised that the Wave Hub cable system survey previously notified was completed on the 30th August 2017 and the survey vessel is now clear of the site.

Details for the survey work undertaken can be found in the download below.

The Wave Hub Subsea Cable Safety Notification provides further as-built detail and safety information concerning the Wave Hub subsea cabling.